§ 3-5-93. Procedure.  


Latest version.
  • At the time of application for a building permit, the applicant shall provide:

    (1)

    A survey of the subject property, signed and sealed by a professional surveyor registered in the State of Florida, which meets the minimum technical standards as provided by chapter 61G17-6, Florida Administrative Code.

    (2)

    A plot plan, signed and sealed by a professional engineer or surveyor registered in the State of Florida, which illustrates grading sufficient to demonstrate that the property, when developed, will drain to an approved drainage facility without interfering with the proper drainage of surrounding properties. Drainage may be towards a canal, drainage green belt, or other established drainage facility. Lots may not drain to a rear lot easement which is not maintained by the county unless approved by the county stormwater utility director and land development supervisor or their designees.

(Ord. No. 98-054, § 1, 7-21-98)